Exchanger Train Economics

 

On a refinery crude unit the furnace inlet temperature can typically degrade at the rate of 5C (9F) per year owing to progressive fouling of the exchangers in the preheat train. In a 660 m3/h (100,000 bbl/day) refinery that represents an increased furnace duty of 2500 kW (8.5 MM BTU/hr) which, at todays prices, would costs in the region of $200,000 per year.

Fouling rates can vary widely one refinery reported a furnace inlet temperature drop of 8C (15F) over a single month. Unchecked that would have cost $3.6M per year.

Click on this image to view it in its own window and in full size   Click here to view this image in full size and in its own window